Entry stairs and retaining wall at the SW on Killingsworth.
Retaining wall (with drain behind it) at the south entrance and the main entrance ramp and stairs at the SE on Killingsworth.
Loading/Unloading zone and garbage/recycling and outdoor storage area.
Retaining walls on the NW side. Re-using our old retaining wall lava rock.
Some work in the north backyards.
Common House terrace as the runnels are being covered.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.