The building that includes most of our Common House. On the main floor, in the basement, and around the terrace. With some units above. (There is a small part of the Common House on the main floor in what we call Common House-North in the NE building.) It may seem we give this building a lot of attention. Partially because the basement took a lot of work. And maybe because it is at the end of the process, but mostly because it is our common space. Kristin and I are enthralled.
A gap between mid-January to early March.
And Some Site Work for the progression of the Common House Terrace.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.