Late August Walkways and Railings



The permanent walkways are in on the west side and the third floor of the east side. And work on the railings has resumed.



The railing system is growing.





Late August Common House


Common House living room built-in bookshelves, community office, and fireplace. Oh, and light fixtures, windows, trim, floors, tile, and vistas.





View from Common House living room into great room, with kitchen, dishwashing, and kids' room in background. Yumm! Peggy and I are loving this room and vista.

And from the Common House great room into the living room.

The Common House Cafe with fab beverage station. Still waiting to unveil those doors.


The Common House great room.



The Common House family room.


Some Late August Site Work






Entry stairs and retaining wall at the SW on Killingsworth.



Retaining wall (with drain behind it) at the south entrance and the main entrance ramp and stairs at the SE on Killingsworth.





Loading/Unloading zone and garbage/recycling and outdoor storage area.


Retaining walls on the NW side. Re-using our old retaining wall lava rock.


Some work in the north backyards.


Common House terrace as the runnels are being covered.



General Site Views



What a difference. The construction trailer was removed today and the construction fence was moved from the street to the inside of the sidewalk. A short panorama.





Skateboarders on the sidewalk where the trailer used to be.




August 24 Progress Shots


Some of Kristin's pictures.

The new retaining wall with parts of the old retaining wall being placed in front.

The ramp down to the bicycle garage in the basement of the Common House.

Common House dishwashing area installation underway.

Common House great room storage.

Common House basement.


Some building views.