Steel stairs at the Common House coming in by crane and being welded into place.
Roof terrace hot tub is on its platform. Walkmat is being installed.
Deck material is on-site and will be installed next.
Deck material is on-site and will be installed next.
Play ground area mapped out. Steel rails are up on the east buildings.
And we can see in through the Common House doors.
And we can see in through the Common House doors.
Common House cafe doors, from the outside and inside.
The unveiling.
The unveiling.
The half wall in the Common House
looking to the great room and the kitchen is trimmed out now.
looking to the great room and the kitchen is trimmed out now.
The Common House kitchen equipment is here.
It is not all installed but look at all that stainless steel. And a fabulous stove and pot rack.
It is not all installed but look at all that stainless steel. And a fabulous stove and pot rack.
Okay. So it may be boring. The Common House toilets. Just awaiting the plumbing now.
With one of the fire extinguishers mounted near the family room.
With one of the fire extinguishers mounted near the family room.